The different functional requirements – the special concept demanded primarily five group rooms but also facility rooms such as a kitchen, an office and a doctor’s room – are clearly separated from each other. The advantages of the wooden skeleton – high degree of prefabrication, low transport volume, quick mounting – were brought into play and within a time span shorter than the one required for the originally intended container solution the building was translated into reality. An additive continuation of this linear scheme is possible at any time and without any problems.